Thursday, 4 April 2013

Adding Data



For each node there is data that you can add and store. Basic information can be added to document the model and meet standards of Managing Successful Programmes (MSP) and benefits management.
 To add data behind each node you need to be in the Model stage of the process. There are several ways of adding data to a node.

-          You can right click a node and chose ‘Edit data’. This takes you automatically to the Model data tab to add information for the node/s that you have selected.

-          You can select the ‘Model data’ tab at the bottom of the screen.

-         Click on a node and expand the 'Details' toolbar on the right hand side of the map. This allows you to add data to the selected node.


Model Data tab



The Model Data screen can be accessed through clicking the tab at the bottom of the screen. Thedrop down list at the top of the screen within the Model data tab selects the type of node to be edited. You can change the node type through selecting the type you wish to edit on the drop down list. 

Select a node on the top half of the screen and its detailed data is displayed in the lower half of the screen. The boxes on the lower half of the screen can be expanded to add and view the data stored in them using the arrow next to each title. 


Adding Data on the Map


Realisor allows data to be edited on the map. This is done through using the right hand side 'Details' toolbar. Select the node you wish to edit the data for and expand the 'Details' toolbar. Different nodes have a different number of data editing options available depending upon the node type. Benefit measures, for example, have an expandable subsection where additional details about the benefit measure and performance levels can be added.  Any data added or edited will be updated in the Model data tab.